Eskom brings back stage 6 to avoid grid collapse
Eskom implemented severe power cuts on Friday to prevent a total collapse of South Africa’s electricity grid.
“Due to the shortage of generating capacity and emergency reserves”, the utility will implement so-called Stage 6 load-shedding, taking 6,000 MW off the system to prevent an overload of demand, it said in a statement.
The return of this level of electricity rationing is a step backwards for South Africa’s government, which has prioritized stabilizing the system.
Eskom last reached Stage 6 in September as warmer weather in the southern hemisphere during the current months results in less electricity demand. That level is expected to last through Monday, the utility said.
Log in or register for free access to all articles.